[Case Study 9 of Dacon Anshin] Gas Equipment Parts Precision Machining Company
This is an introduction to a case where lot management has been achieved, allowing for a seamless transfer to the cleaning process without any hassle.
In the precision cutting processing industry for gas equipment parts, products are accumulated in a plastic case after processing, and there was a subsequent task of transferring the products to a washing basket. Therefore, we introduced Dacon Anshin and added a counter to enable quantity management. As a result, we were able to manage lots and eliminate the hassle of transferring, allowing us to flow directly into the washing process. [Challenges (Issues)] ■ We want to eliminate the transfer process of products before the washing stage. ■ There were instances of scratches occurring during the transfer, and we were considering countermeasures. *For more details, please refer to the PDF document or feel free to contact us.
- Company:伊藤精密製作所 MSTEC事業部
- Price:Other